Three areas: the floor, the shower walls, and the upturn
A bathroom membrane is one continuous tank under the tiles. It covers the floor, runs up the shower walls to at least 1800 mm above the finished floor, and turns up every other wall at the floor junction so water that gets under the tiles cannot find the bottom plate. Add those three areas together and multiply by the product's coverage rate for two coats, and you have the litres. Most liquid membranes sold in Australia need between 1.2 and 1.8 litres per square metre in total to reach their specified dry film thickness; the data sheet has the figure.
litres = (floor + shower walls + upturn) × coverage per m² for both coats
| Bathroom | Area to membrane | Membrane | 15 L pails |
|---|---|---|---|
| 1.8 × 1.5 m, corner shower | 6.7 m² | 10.0 L | 1 |
| 2.4 × 1.8 m, corner shower | 8.6 m² | 12.8 L | 1 |
| 3.0 × 2.0 m, corner shower | 10.5 m² | 15.7 L | 2 |
| 3.0 × 2.4 m, alcove shower, full height | 14.9 m² | 22.3 L | 2 |
900 × 900 shower, 150 mm upturn, 1.5 L/m² over two coats.
The order of work
Prime the substrate. Fit bond breaker or reinforcing bandage to every junction where two surfaces meet, because that is where movement cracks a membrane. Apply the first coat, let it cure for the time on the data sheet, and apply the second at right angles to the first. Leave it to cure fully before tiling or flood testing, usually 24 to 48 hours and longer in cold weather. The waste and the puddle flange are part of the system and are sealed to the membrane, not tiled around.
Worked example
A bathroom 2.4 by 1.8 m with a 900 × 900 corner shower. Floor 4.32 m². Shower walls 1.8 m of wall × 1.8 m high = 3.24 m². The other 6.6 m of wall gets a 150 mm upturn, 0.99 m². Total 8.55 m². At 1.5 L/m² that is 12.8 litres: one 15 litre pail, with 1.7 litres of primer and about 12 metres of bandage.
Common questions
How much membrane for a bathroom?
About 1.5 L per m² over two coats. A typical small bathroom takes one 15 litre pail.
How high in the shower?
At least 1800 mm above the finished floor. Many builders go to the ceiling.
The whole floor?
Required on timber and upper floors; good practice everywhere.
Can I do it myself?
It depends on your state's licensing rules. Check before you start.
A quantity estimate. Wet-area waterproofing must comply with AS 3740 and the National Construction Code, and in some states must be done and certified by a licensed waterproofer.