A circle holds about four-fifths of the square around it
A round slab holds π ÷ 4, about 79 percent, of the concrete a square slab of the same width would. Square the radius, multiply by π and by the thickness, and that is the volume. For a ring, such as a paved surround with a fire pit in the middle, work out the outer circle and take away the inner one. The forms are the fiddly part: a round edge needs a bendable edging or kerfed timber, and the mesh still comes in rectangular sheets that have to be cut to the curve.
volume = π × (outside radius² − inside radius²) × thickness
| Diameter | Area | m³ at 100 mm | 20 kg bags, with 10% waste |
|---|---|---|---|
| 1.5 m | 1.77 m² | 0.18 | 21 |
| 2.0 m | 3.14 m² | 0.31 | 38 |
| 2.6 m | 5.31 m² | 0.53 | 63 |
| 3.0 m | 7.07 m² | 0.71 | 84 |
| 4.0 m | 12.57 m² | 1.26 | 149 |
Tank pads
A rainwater tank is the heaviest thing most people put on a small slab: a litre of water weighs a kilogram, so a full 5,000 litre tank is about 5 tonnes on a few square metres. Tank makers publish what they want underneath, usually a level, compacted base and a reinforced pad a little wider than the tank, and the warranty can depend on it. Use their diameter and thickness here, not a rule of thumb, and make sure the overflow and the first-flush diverter are not draining onto the pad's edge.
Worked example
A 3 m round patio 100 mm thick: π × 1.5² = 7.07 m², × 0.1 = 0.71 m³, or 0.78 m³ with 10 percent waste. That is 84 bags of 20 kg or 0.8 m³ of premix, one sheet of SL72 mesh cut to the circle, and 9.4 m of curved edging. Leave a 1.2 m fire pit in the middle and the volume drops to 0.59 m³, with another 3.8 m of edge.
Common questions
How much concrete for a round slab?
π × radius² × thickness. A 3 m slab at 100 mm is 0.71 m³.
How much concrete for a water tank pad?
Use the tank maker's pad size. A 2.6 m pad at 100 mm is about 0.58 m³ with waste.
How heavy is a full water tank?
About a tonne per 1,000 litres, plus the tank.
Concrete for a fire pit ring?
Outer circle less inner circle, times thickness.
Quantities are estimates for ordering, not structural design. Follow the tank maker's installation guide for tank pads, and your engineer's drawings for anything structural.