Calculators › Concrete & footings

Concrete for post holes calculator

Bags per hole and total bags for fence, deck and pergola posts. Allows for the post itself and a bit of waste.

How the post hole calculation works

A post hole is close enough to a cylinder, so its volume is the circle area times the depth. The calculator works out the hole volume, takes away the volume of the post sitting in it, adds your waste allowance, and divides by what one bag makes. Bags are rounded up per hole, because you cannot mix two thirds of a bag for one hole and carry the rest to the next one without the first batch going off.

concrete per hole = (π × (diameter ÷ 2)² × depth) − (post width² × depth), then + waste

A 300 mm hole 600 mm deep holds 0.042 m³. A 90 × 90 mm post takes up 0.005 m³ of that, which leaves 0.037 m³. Add 10 percent and you are at 0.041 m³, or five 20 kg bags. That figure, four to five bags per fence post, is the one most fencers carry in their heads.

Hole size and depth

The hole needs to be wide enough that there is a proper collar of concrete around the post, and deep enough that the post cannot lever out under wind load. Three times the post width is the usual diameter, so 300 mm for a 90 or 100 mm post. For depth, the old rule of a third of the height above ground gives 600 mm for a 1.8 m fence, and that is a sensible minimum. Gate posts carry a swinging load and go deeper, 800 to 900 mm, often in a wider hole. Corner and end posts take the strain of the whole run and are treated the same way. In sand or soft clay everything goes deeper again.

PostHoleConcrete20 kg bags
90 × 90 fence post300 × 6000.041 m³5
100 × 100 fence post300 × 6000.040 m³5
125 × 125 gate post400 × 9000.109 m³12
90 × 90 deck post350 × 6000.058 m³7
65 × 65 steel post250 × 6000.030 m³4

Figures include 10 percent waste and are rounded up to whole bags.

What a builder allows We buy whole bags per hole, round up, and add a couple of spare bags to the order for the hole that turns out bigger than the auger because the ground fell in. Nobody has ever regretted two spare bags at $10 each. Plenty of people have regretted a second trip to the hardware store with wet concrete in the barrow.

Setting the post

Put 50 to 100 mm of gravel in the bottom of the hole so the end of a timber post is not sitting in water. Stand the post, plumb it in both directions and brace it with two stays before the concrete goes in. Mix to a stiff consistency, fill the hole and rod it to get the air out. Finish the concrete slightly above ground level and slope it away from the post so rain runs off instead of pooling against the timber. Leave the braces on until the next day for standard mix, or half an hour for rapid set.

Rapid set or standard?

Rapid set is worth the extra money for a few posts, a repair, or a gate post you need to hang the same day. For a full fence line, standard premix is cheaper and you can set the whole run and go home. Yield per bag is much the same for both, so the calculator does not distinguish.

Worked example

A 24 m paling fence with posts at 2.4 m centres needs 11 posts. Each 90 × 90 post goes in a 300 × 600 hole: 0.041 m³ with waste, so five bags each. Fifty-five bags for the run, plus two spare, is 57 bags, about 1.1 tonnes to carry. Water is around 2.3 litres a bag, so have a hose within reach.

Common questions

How many bags of concrete for a fence post?

Four to five 20 kg bags for a 90 or 100 mm post in a 300 × 600 mm hole. Gate posts in a 400 × 900 hole take about twelve.

How deep should the hole be?

A third of the post height above ground, with 600 mm as the practical minimum for a 1.8 m fence. Gate and corner posts 800 to 900 mm.

How wide should the hole be?

About three times the post width. A 90 or 100 mm post goes in a 300 mm hole.

Rapid set or standard concrete?

Rapid set for a few posts or same-day gates. Standard for a long run, it is cheaper and there is no hurry.

This calculator gives quantities from the dimensions you enter. Footing depth for structures such as decks, pergolas and retaining posts should follow the drawing or the engineer's advice for your soil.