How to read these figures. The ranges come from the published guides and price lists under Sources, checked in October 2026. They are not BuildMaths prices, not a builder's rates and not a quote. Sites, specifications and trades vary; written quotes are the only real price.
What the published rates say
| Finish | Published range per m² laid | 30 m² slab or path |
|---|---|---|
| Plain | $65 to $115 | $1,950 to $3,450 |
| Coloured | $75 to $140 | $2,250 to $4,200 |
| Exposed aggregate | $100 to $150 | $3,000 to $4,500 |
| Stamped or stencilled | $100 to $180 | $3,000 to $5,400 |
Ready-mix supply prices are harder to pin down than laid prices, because suppliers quote with and without GST and delivery. Published Victorian figures for 25 MPa run from about $265 to $370 per cubic metre. One regional supplier's price list shows why small jobs sting: 3 cubic metres works out near $264 per cubic metre including GST, while 0.4 of a cubic metre costs over $800 per cubic metre.
What moves the price
Access comes first. If the truck can chute straight into the formwork the job is cheap; if it needs a pump or wheelbarrows, add several hundred dollars. Then the size of the pour, since anything under three or four cubic metres attracts a short-load fee. Then the finish, where exposed aggregate and stamped work cost more for the mix and far more for the labour and the weather risk.
Sources
- Eureka Concrete, price list, updated April 2026.
- Built Simple, concrete cost per m³, 6 July 2026.
- Mixhub, concrete pump hire rates, April 2026.
- Canstar, concrete slab cost, 9 May 2023.
- ServiceSeeking, concrete slab cost guide, 2026.
Common questions
How much does concrete cost per square metre laid?
Published guides put plain concrete at about $65 to $115 per square metre laid, coloured at $75 to $140, exposed aggregate at $100 to $150 and stamped or stencilled at $100 to $180.
How much is a cubic metre of concrete?
Published Victorian figures for 25 MPa ready-mix run from about $265 to $370 per cubic metre supplied. Whether GST and delivery are included varies by supplier.
What is a short-load fee?
A charge for ordering less than a full or minimum load, usually under 3 to 4 cubic metres. Published schedules show about $50 to $90 for each cubic metre short, so small pours cost much more per cubic metre.
Do I need a concrete pump?
Only if the truck cannot reach the pour. Published Melbourne rates for a line pump are about $165 to $225 an hour before GST, with a minimum hire of three to four hours.
Published third-party cost ranges for general guidance only. They are estimates, not a quote or advice, and exclude anything listed as excluded above. Get written quotes for your site and specification.